the current state of Norbiton’s manufacturing quarter and the anticipated layout in the future. The entire area is slated to undergo a , transforming it into a residential district.
At present, the location lies to the east of Norbiton, with a river flowing from west to east in the northern sector. The farmland is situated to the north of the river, and a roundabout occupies the centre of the district, providing access to two exits. One leads to a main road in the south, while the other is oriented towards the east,
In the future, two new exits will be constructed at the roundabout, enabling passage , crossing over a newly built bridge that leads to new housing. The countryside in the northeast will be the only remaining sector untouched. will be built on the main road to link to the larger roundabout. The factories will be replaced by housing and facilities like shops and a medical centre, and a school will be constructed in the east,
