show an airport layout in the present time and proposed changes next year after . It can be seen that a host of changes are planned for the future. The principal change will be on the north side and entrance.
Currently, there are two divisions, arrivals and departures ; on the arrival side, after the hall for , whereas on the departure side, in the hall where check-in is on the left side and . is security passport control. Additionally, passport control has some space, and the north side has a square shape area. in the centre, has 8 gates as well walkway is on left side
After development, departures and arrivals to two. On departure side, whereas, and cafe . On the arrival side, the area will expand and . East wall ATM and cafe also take place.
Furthermore, passport control will be the same as now although . North way six gates remain the same; however, six will develop in north-east side and same will on the north-west side. Middle of it sky train build.
