Norbiton 工业区重建规划地图

Norbiton Industrial Area Redevelopment Maps

The maps below show an industrial area in the town of Norbiton, and planned future development of the site.

Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

下面的地图显示了 Norbiton 镇的一个工业区,以及该场地未来的规划开发。

请选择并报告主要特征来概括信息,并在相关之处进行比较。

来自本题范文

要点:Norbiton 工业区重建规划地图

为什么这是地图 ,要求你描述一个地方发生了哪些变化。

所以我们把要点分为概述(这个地方的整体变化)和主要变化(新增、拆除、移动或保留了什么)。

概述

1个要点

主要变化

8个要点

同一道题 · 不同范文

范文与批改

范文 01

必改建议

作文 · 219词 · 3段 · 16条批注

分数详情

范文 01
估算分数6.0/ 9

总体评价

The response identifies the main transformation from factories to housing and the new river bridge, showing sound selection of key features at adequate length. Its main limitations are some vague or imprecise descriptions of layout changes, a confusing use of the word infrastructure, and occasional grammatical errors such as sentence fragments.

TA

任务完成情况

The response gives a clear overview of major change and covers relevant features such as the new bridge, housing replacing factories and new amenities, but several details are vague or loosely stated, including describing housing and facilities collectively as infrastructure, and the reported features are not always located precisely against the maps.

6.0
CC

连贯与衔接

Progression is broadly clear with an overview and logical present-to-future comparisons, though cohesion devices such as 'interestingly' and 'it is also interesting to know' are mechanical and some comparisons, like the claim about infrastructure dominating the central part, are hard to follow.

6.0
LR

词汇丰富度

There is adequate range for a map comparison (replaced with, dominated by, stretch to, intended layout), but word choice is at times imprecise or inappropriate, as in 'a limited number of infrastructure', 'vicinity' and 'tremendous changes in infrastructure'.

6.0
GRA

语法多样性与准确性

A mix of simple and complex structures is used with some accuracy, but errors are noticeable, including the fragment 'However, no bridge aiding workers to cross the river', faulty passive constructions and article problems, though meaning generally remains clear.

6.0

下一步改进重点

Describe specific location changes precisely (e.g. where shops, the medical centre, the school and the new roundabout are placed) and replace vague terms like infrastructure with the actual features being compared.

来自本题范文

实用词汇:Norbiton 工业区重建规划地图

来自本题范文

句型:Norbiton 工业区重建规划地图

练习这道题

写下你的作文

已加载题目:A类小作文。
第1部分

建议用时约 20 分钟,至少写 150 词。

词数:020:00 输入第一个词后开始计时